INDUSTRIAL ZONE PHASE 1
The first industrial zone, Industrial Zone Phase 1 (IZP 1), was established in 1994. It spans 617.76 acres and accommodates more than 20 manufacturing multinational corporations (MNCs), including prominent names like AMS OSRAM, Fuji Electric, and Intel.
In IZP 1, 16 manufacturing businesses operate alongside 6 utility companies and 3 logistic providers. Manufacturing tenants of IZP 1 originate from Germany, Canada, Austria, Luxembourg, the United States, Japan, China, and Malaysia. With a strong front-end semiconductor presence, 2 of the 4-wafer fabrication MNCs, as well as 7 semiconductor manufacturers from various industrial sectors are based here,
In IZP 1, 16 manufacturing businesses operate alongside 6 utility companies and 3 logistic providers. Manufacturing tenants of IZP 1 originate from Germany, Canada, Austria, Luxembourg, the United States, Japan, China, and Malaysia. With a strong front-end semiconductor presence, 2 of the 4-wafer fabrication MNCs, as well as 7 semiconductor manufacturers from various industrial sectors are based here,